I was gone to France for a couple of weeks and it looks like very little riding or trail work was done in my absence.  One cookout was held at the Rogers cabin but apparently no pictures were made.  There are logs all over the trail, one bridge is washed downstream into another one, and the trails are overgrown with vegetation.  Some big limbs fell on the swimming dock but they have now been removed and the swimming hole is re-opened.  Plums and blackberries are ripe and I have picked and made one pie already.  The SCHIMBA Whale is under construction at Randy’s building. 