mountain bike ride and bridge repair Jan. 18

January 18th, 2009

Richard, Randy, and John rode 10.6 miles up the dirt road to Sunset Point and then to the hill formerly known as Cookses, on to the Airport Road gate and returned on the dirt road to the trail on the Young-Welch boundary and down the Sugar Camp Hollow singletrack back to the Cabin.  We stopped to put two bridges back in place and observe the icicles at the SCH waterfall.  Moving time 2 hr., 31 min., stopped 45 min., total ascent 1040 feet.  No problems except that John slipped off a root on the waterfall trail causing contusions in a place that cannot be displayed on the web.

 

At Sunset Point:

100_8518 100_8520 100_8521 100_8521a 100_8522 100_8518a 100_8519

100_8523

 

At the top of the big hill:

100_8530 100_8525 100_8526 100_8527 100_8528 100_8529

Bridge repair:

100_8541 100_8542 100_8543 100_8531 100_8532 100_8535  100_8537 100_8539 100_8540

Ice at the waterfall:

 100_8549 100_8550 100_8545  

 

The instant bridge:

image

Trackback URI Comments RSS

Leave a Reply